If you're looking for photos and information on the progress of our new building, you've come to the right place! Every week I will be publishing new photos from the building site along with a short narrative that discusses our progress.

10.25.12 Photos from the open house and parking lot paving.

10.20.19

10.20.18

10.20.17

10.20.16

10.20.15

10.20.14

10.20.12

10.20.11

10.20.10

10.20.9

10.20.8

10.20.7

10.20.6

10.20.5

10.20.3

10.20.2

10.20.1

9.27.12 It has been a busy two months, but we are up and running at the new location. All furniture is in place and the grounds will be finished soon.

Ext 2

Ext

Int 11

Int 10

Int 9

Int 8

Int 7

Int 6

Int 4

Int 3

Int 2

Int

Pack 3

Pack 4

Pack 2

Pack

7.24.12 Shelf assembly day.

Shelving 3

Shelving 2

End

Shelving 1

6.5.12 I stopped by the new building today and snapped a few photos of the progress. We're basically down to electrical, HVAC, paint, hardware and finishing.

6.5.12

6.5.10

6.5.9

6.5.8

6.5.7

6.5.6

6.5.5

6.5.4

6.5.3

6.5.1

6.5.2

5.21.12 The building is progressing quickly as most of the work on the exterior has been completed.  We're looking at an end of June completion date.

Int

4.24.12 Roof, siding, brick nearly completed.

4.23.3

4.23.2

4.23.1

4.23

4.13.12 Exterior roof, siding, brick.

ext3

ext2

ext1

4.12.12 Shots from the interior.

int2

Int

3.27.12 I just got back from vacation to find that the building now has a full roof, but hasn't progressed quite as quickly as I had hoped due to the strong winds.

ext4

pic7

pic5

pic4

pic3

pic2

pic1

3.6.12 We have had a slow few weeks as we have waited for the trusses to arrive from the west coast. They were delivered on 3.5.12 after a slight delay caused by snow out west.  Now that they have been set into place, the roofing will begin. 

3.6.1

3.6.2

3.6.3

1.21.12 It has snowed the last few days, so we haven't had as much progress, but if you look closely you will find more walls framed.

1.20.1

1.20.2

1.12.12 It may be snowing today, but much progress has been made this week visually speaking as the framing of the building has begun a week ahead of schedule. 

1.12.05

1.12.04

1.12.01

1.12.12 Today as I drove into town I found that framing had begun.  Thanks to near 60 degree temps. Unfortunately, it's going to snow later this week.

1.12.03

1.12.02

1.16

12.22.11 Work continues to progress at the new building site as evidenced by the erection of the storm shelters/restrooms.  If the weather continues to cooperate, i.e. no snow, they should begin framing in the next two weeks.

12.22

12.22.2

12.22.3

12.22.4

12.2.11 I was finally able to snap some photos of the cement pouring.  The site has been quite active the last several days.

12.1.1

12.1.2

12.1.3

12.1.4

11/30/11 Things have progressed since I left for vacation as the new building continues to get its footprint cemented.  I'll have more pictures of the progress latter in the week once I've gotten time in the daylight.

11/10/11 I ventured out to what is now a soggy construction site to find cement trucks backed up as they pour the footings for the building.

11.10

11.10.2

11/7/11 On my way into work today I noticed that the lot was busier than it has been the previous couple weeks as there were several trucks and people along with more machinery. It would appear that they should be able to start pouring cement in the near future.  Please see the following photos.

11.7

11.7

10/17/11  No new milestones at the site to speak of as work progresses.  They should be pouring cement in the next week or two. Here's some photos of the groundbreaking, which was held 10/13.

SBT2

SBT

sbt3

lot

lot 1

lot 4

lot 7

The Beginning. Renderings of the exterior and interior layout.

Floor Plan 3.0

New Building

CLICK HERE FOR Old Pages from Michael's New Building Photo Journal